PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at Bathrooms 133-136 Facing North.jpg Installing split wire aboce the ceiling for the Emergency night lighting Facing East.jpg Laying out block at the Attorneys Room Facing East.jpg Connecting copper piping to the 2nd floor VAV boxes Facing West.jpg Installed conduit inside the door frames Facing South.jpg
Next page Block work at Bathrooms 133-136 Facing North
Block work at Bathrooms 133-136 Facing North